Houston Asbestos Abatement Industrial Facilities

Several of our power plant asbestos abatement projects have been in the southern United States. However, ARC has eight regional offices across the nation from Denver to New Orleans, and we are capable of serving power companies across the United States.

Power Plant/Industrial SitesHouston Asbestos Abatement Industrial Facilities

  • Georgia Pacific Paper Mill, Arkansas
  • TXU Power Plant, Savoy, Texas
  • TXU Power Plant, Monahans, Texas
  • Plant Eaton, Mississippi
  • Cleco Power Plant, Louisiana
  • Natchitoches Power Plant, Louisiana
  • Lolita Pipeline, Texas
  • Conoco Phillips, Texas
  • GSH Pipeline, Louisiana
  • Driver Pipeline, Texas

ARC on the Job

Houston Asbestos Abatement Industrial FacilitiesOne power plant asbestos project had us smelling the clean Gulf air.  It was a six-figure project has ARC abating asbestos in the turbine room of a power plant in south Texas, near the Gulf of Mexico. Though the boiler room was abandoned nearly a decade ago, and the conditions around the site during the cleanup have been less than ideal, the project is going very well. Environmental cleanup projects such as this one in south Texas are particularly important in coastal areas such as this because of their delicate ecosystems and ocean contiguity.

Houston Asbestos Abatement Industrial FacilitiesAnother project took us to Savoy, Texas, where we abated asbestos from a TXU power plant. This seven-figure environmental remediation project is furthering TXU’s efforts to provide clean, affordable energy. TXU has found so much success with clean energy production that they are offering free energy to their customers during certain parts of the day. Similar projects include Plant Eaton, Cleco, and Natchitoches Power Plants. 

To learn more about ARC Abatement Industrial Services click here.

Engineering News-Record’s ranked us 8th in its Top 20 Asbestos Firm 2020 report. “COVID has slowed our total volume by 15%,” said Ron Daniel, founder and CEO of ARC Abatement. “However, with the extra steps of ARC’s COVID safety guidelines, this has been a positive effect on our employees and clients.”

In early March 2020, ARC launched a facility disinfecting service ranging from a customized, comprehensive COVID-19 proactive program to actual cleaning high-touch surfaces. The new service generated hundreds of projects.

With ARC’s expansion in 28-plus states, Daniel believes that company growth will remain strong in 2021, with revenues expected to reach $45M. ARC also will expand next year with new offices in Florida and Utah. Notable projects recently completed and/or underway in the United States include:

  • Ten months of asbestos removal at the Meredosia Power Station in Illinois totaling in the mid-seven figures.
  • Asbestos removal in several hundred duplexes at Texas State Technical College in Waco, Texas, making way for new student housing.
  • Seven-figure asbestos removal at both the Luminant Power Plant in Fairfield, Texas, and the Luminant Power Plant in Mount Pleasant, Texas, completed in 12 months.

In 2020 ARC Abatement celebrated 30 years of hazardous material abatement work. The company has never been dismissed or failed to complete an asbestos abatement, mold remediation, or lead abatement project in its three decades.

ARC Abatement has one of the best safety records across all areas in which it works. It has also earned a very competitive Experience Modification Rating (EMR), allowing one the highest quality insurance and bonding programs in the industry.

Read the press release.